Our custom designed and built switch tie grapple clamp makes tie change-out an enhanced operation. We are hi-railed with C.R.O.R. operators and years of experience. And yes, we do track ties as well.
ON-TRACK’S tie panel clamp easily lifts off 7 ties in a tier. Concrete ties are telescoped out to the correct spacing between each tie for accuracy within millimeters.
No worries about grass fires or flammable gasses. One operator only with no need for a 3-man crew. The Rail Breaker can make 50-70 cuts per one hour of track time and travels the track unit speed.
Tie-Changeout? Wood, Track or Switch ties? Concrete ties or crossing rehab
ON-TRACK’s Hi-Rail rubber tired machine with patented tie-clamp can do the job.