Certified Combination Rail / Truck to handle both incoming and outgoing shipments..Custom Craning Services on bridge decks and timber hauling.
Custom Loading of wood and concrete ties to bulkhead flats for transport and distribution
CW Rail handling, cropping and storage.
Derailment Cleanup from site locations for further processing at Duagh
Marshalling Yard
Panel Track Construction, Stockpiling, Loading to Rail Cars
Rail Car Cleaning Facilities
Rail Car Movers and Railway equipment fabrication, repairs and maintenance.
Rail Switch (Turnout) assembly and stocking location.
Relay Quality Rail Recovery Operations
Scrap Rail Cutting to 36 lengths by portable trailer mounted rail breaker – 300 tons per day.
Storage, marshalling, loading and offloading of track materials and other satellite services for railway and industry affiliates.
Track Material Reclamation / Rehabilitation. (Ties, Rail, Spikes, Anchors, Plates and Bolts)
Wood Tie Pre-Plating – Advance pre-plating for placing to grade and correct spacing